Helping Lindblom

Constructed in the 1920s, the Lindblom Math & Science Academy was selected as the Region 5 College Preparatory Academy for the City of Chicago. Chicago Public Schools dedicated over $30 million to a Major Capital Renovation (MCR) to provide a state-of-the-art educational facility. Tishman Construction served as Construction Manager for the renovation of the 330,000-square-foot Lindblom High School in Chicago.

The school was originally built in 1919. The first phase of the project involved window and door replacement, as well as ADA compliance work such as ramps, reconfigured restrooms and Braille signage. Mechanical and electrical upgrades were undertaken to provide air conditioning to all areas of the school, including a new chilled water system, cooling coils, ducted return systems, mechanical exhaust, generator, transformer and new DDC controls. Tishman Construction also oversaw the installation of new interior finishes, lighting systems and newly landscaped grounds.

BauerLatoza Studio worked as the Managing Architect to develop the overall school program, phased scope of work, construction budget, and to oversee the comprehensive renovation design for this 330,000-square foot building. BauerLatoza Studio then provided Architect of Record Services for Phases II through IV for the interior and exterior renovation. Highlights of that scope of work include:

  • Exterior beautification and envelope stabilization, including new windows and exterior doors, painting of cast iron spandrel panels, site lighting, masonry restoration, and outdoor classrooms;
  • Interior beautification, including new lighting, painting, and woodwork refinishing at classrooms and new doors, lighting, and floor finishes at corridors;
  • Accessibility upgrades including accessible entrances, ramp and parking, stage access, interior signage, assisted listening system, new toilet, shower, and locker room facilities, and fire alarm upgrade with audio-visual strobes;
  • Educational Enhancements including auditorium seating, interior pool upgrades, two new biology labs, two prototypical science labs, distance learning lab, computer labs, a new weight room, art and journalism rooms, choral, band, and private practice rooms;
  • Auditorium renovation and restoration including seating, lighting and back stage technical upgrades;
  • New professional library and media center;
  • Administrative Upgrades including upgraded finishes and casework at main entry, vestibule, lobby, counselor’s suite, attendance office, and resource room.
  • Air conditioning to the occupied spaces in the building;
  • New lunchroom, serving line, and kitchen;
  • Site improvements, including parkway trees and new main entry stairs.

Downloadable LAA Application

LAA Application.pdf
Please mail your completed application and check to;
Lindblom Alumni Association
6130 South Wolcott Ave
Chicago, Illinois 60636

QUICK SUBMIT FORM

Latest Post